Southern Africa
Botswana invites bids for 70km transmission line
![](https://constructafrica.b-cdn.net/cdn/ff/Pl6dzCrnECSQo_7DjJ9AFaJNvs3_jLRyNHwbcrsusp0/1715285615/public/styles/node_large_940x540/public/2024-05/Botswana%202.jpg?itok=wkQT-WB2)
Botswana Power Corporation is inviting bids for the detailed engineering design, procurement, construction and commissioning of the proposed 70km 220kV Pandamatenga-Kazungula transmission line, as part of the Northwest Transmission Grid Connection Project. The bidding process is open to 100% citizen-owned companies only.Proposals must be physically delivered by 10h00 (CAT) on